Call 801-783-1405 Request a Quote
← All Articles

Do You Need an Electrical Panel Upgrade?

Signs your panel is outdated, what a panel upgrade actually costs in Utah, and what to expect from the first call to final inspection.

Not sure if your panel needs upgrading? Get a free assessment — we'll tell you straight.
Request a Quote 801-783-1405

Your electrical panel is the single point that every circuit in your house runs through. When it can't keep up with modern electrical demand, you feel it in small, annoying ways — until one day it becomes a safety issue. Here's how to know which one you're dealing with.

The Warning Signs You Shouldn't Ignore

Most homeowners don't think about their panel until something forces them to. Watch for these signs:

Safety note: A warm panel, burning smell, or visible scorching is not a "schedule it for next month" issue. Shut off what you can safely and call us at 801-783-1405.

Why Panels Become Outdated

A panel installed 30–40 years ago was sized for the electrical load of that era — a few lights, a refrigerator, a window AC unit. Today's homes run central air, electric ranges, multiple TVs and computers, home office equipment, and increasingly, EV chargers. The panel itself doesn't wear out from age so much as it gets outpaced by demand it was never designed to carry.

What Does a Panel Upgrade Cost in Utah?

Every home is different, but here's a realistic range for a standard residential upgrade:

UpgradeTypical Range
100A → 200A panel upgrade$2,200 – $4,500
200A → 400A service upgrade$4,000 – $8,000+
Subpanel addition$900 – $2,200

What moves the price within that range:

Anyone quoting you a number without seeing your panel is guessing. We give firm quotes after a short on-site assessment — no surprise charges once work starts.

100A vs. 200A vs. 400A: Which Do You Need?

100A is the legal minimum in most areas but is tight for a modern home with central air and any future upgrades in mind. 200A is the standard recommendation for most single-family homes today — it comfortably handles AC, an electric range, and an EV charger with room to spare. 400A is typically reserved for large homes with multiple high-draw systems (dual AC units, a shop, a pool, multiple EV chargers) or homes planning significant future additions.

What to Expect During the Upgrade

  1. Assessment & quote — we look at your existing panel, service size, and what you're planning to add, and give you a firm number.
  2. Permit — we pull the permit and, if needed, coordinate a temporary disconnect with your utility.
  3. The upgrade itself — typically completed in a single day. Power is off for a portion of that day; we'll tell you exactly how long before we start.
  4. Inspection — a local inspector signs off on the work. We schedule this and are present for it.

Get a straight answer on your panel.

Tell us what's going on and we'll give you a clear recommendation — no upsell, no guesswork.

Panel Upgrade FAQ

How long does a panel upgrade take?

Most residential panel upgrades are completed in a single day, including the utility disconnect and reconnect. Larger service upgrades or jobs requiring trenching can take longer — we'll give you a specific timeline during your quote.

Will I be without power during the upgrade?

Yes, for part of the day. Your utility (typically Rocky Mountain Power) disconnects service before we can safely work on the panel. We schedule this window in advance so you can plan around it.

Do I need a permit for a panel upgrade in Utah?

Yes. Every jurisdiction we work in requires a permit and inspection for panel upgrades. We handle the permit application and inspection scheduling as part of the job.

Can I upgrade my panel myself?

We don't recommend it. Panel work involves the main service conductors, which stay energized even when the main breaker is off, and mistakes here are a serious fire and shock risk. It also requires a licensed electrician to pull the permit and pass inspection in Utah.

Ready to stop guessing
about your panel?

We'll take a look, give you a straight recommendation, and a firm quote — no pressure.

Call Now Get a Quote