Call 801-783-1405 Request a Quote
← All Articles

Adding an EV Charger to Your Home

A practical guide for Utah homeowners: what a Level 2 charger costs to add to an existing home, whether your panel can handle it, and what installation day looks like.

Ready to charge at home? Get a fast, firm quote on Level 2 charger installation.
Request a Quote 801-783-1405

You don't need a new-construction garage to charge your EV at home. Most existing homes in Utah can add a Level 2 charger with a straightforward electrical install — here's what's actually involved.

Level 1 vs. Level 2: Why Most Homeowners Upgrade

Every EV ships with a Level 1 charging cable that plugs into a standard 120V outlet. It works, but it's slow — typically 3–5 miles of range per hour, which means a full charge overnight can be a stretch for anyone driving a normal daily commute. A Level 2 charger runs on a dedicated 240V circuit and delivers 20–40+ miles of range per hour, turning an overnight charge into a non-issue regardless of how depleted the battery is.

Does Your Panel Have Room for an EV Charger?

This is the question that actually determines your cost. A Level 2 charger typically needs a dedicated 40A or 50A, 240V circuit. Before we install anything, we check two things:

If your panel is maxed out, you have options: a load management device that shares capacity intelligently, or a panel upgrade. If you're not sure where you stand, read our panel upgrade guide — it's often a smaller add-on than people expect when it's bundled with the charger install.

What Does Home EV Charger Installation Cost?

ScenarioTypical Range
Charger circuit, panel has room, short run$800 – $1,400
Longer run or panel is far from the garage$1,400 – $2,200
Panel upgrade required firstAdd $2,200 – $4,500

What affects your specific price: distance from the panel to the charger location, whether we're running conduit through a finished wall or garage, and whether a permit-required inspection adds scheduling time (it does, and it's required — see below).

Choosing a Charger and Circuit

Two common approaches:

Either way, the circuit needs to be sized correctly and, per NEC requirements, most installations need GFCI protection at the breaker or charger. This isn't optional — it's what keeps a 240V circuit sitting in a garage safe.

The Installation Process

  1. Site visit & quote — we check your panel, measure the run, and confirm charger placement with you.
  2. Permit — required in every Utah jurisdiction we work in. We pull it.
  3. Installation — typically a half-day to full-day job depending on the run length.
  4. Inspection — scheduled and attended by us.

Garage, Driveway, or Carport — Placement Considerations

Cord length matters more than people expect — most EV charging cables run 18–25 feet, so charger placement relative to where you actually park (and which side your charging port is on) affects both convenience and cost. We'll walk the location with you before finalizing the quote so there are no surprises.

See exactly what it'll take.

We'll check your panel, measure the run, and give you a firm number — same trip.

EV Charger Installation FAQ

Do I need a permit to install a home EV charger?

Yes, in every jurisdiction we work in. It's a 240V dedicated circuit and it needs to be inspected. We handle the permit and inspection as part of the job.

Does it need to be a licensed electrician?

For it to pass permit and inspection, yes. Beyond the code requirement, a 40–50A circuit sized incorrectly is a real fire risk — this isn't a project to DIY.

How long does installation take?

Most installs are done in a single visit — a few hours to a full day depending on the distance between your panel and the charger location.

What if my panel doesn't have room?

We'll walk you through the options — a load management device or a panel upgrade — and give you a combined quote so you know the full cost before committing.

Ready to charge
at home?

Tell us about your EV and your garage setup — we'll take it from there.

Call Now Get a Quote